Combined Tide and Wind Run Example

EC 95d Grid

EC 95d Bathymetry
Run parameters:
Hot Start file used = fort.68
NWS = -2 (wind and pressure data are read in at all grid nodes at a time interval not equal to the model time step, beginning time should correspond to the hot start time)
Timestep = 30 seconds
The total run length = 765 days, however, the model was hot started at the end of day 764, therefore the immediate run had a duration of 1 day.
Ramp - 12 days
WTIMINC (meteorological wind time interval in seconds) = 21600.