This is a table describing most of the photos I took during the construction of our passive solar home. I told friends, suppliers and subcontractors that I would post photos on my UNC Web site. It was a little more complicated since I don't own a digital camera.
I took the time to put prints in an album, but I want to be able to tell the story without lugging the album around. Unfortunately my shoebox filing system was a mess! The image identification on a CD often does not match the the numbering of negatives. This exercise has required me to take the important start toward creating Web pages I will want to share with others.
Choosing the headings for the table helped me consider many different ways to organize the images. I will create separate pages for different phases of the project. Had I not learned about how to check download time, I might have made pages that would not be read.
This chart will help me select photos for the Photos page linked from the main site.
| Subdirectory within House Construction Photos | Negatives Set Number | Image number (if sorted to that level of detail) | What is it? | When did this occur? |
|---|---|---|---|---|
| Land moving | 1971 | 15 | begin clearing | May 29, 2001 |
| Land moving | 1971 | 16 | clearing, notice blue tarp over pine porch posts | May 29, 2001 |
| Land moving | 1971 | 17-23 | continue clearing | May 29, 2001 |
| Land moving | 2983 | 9 | adjusting silt fence | July 2001 |
| Road related | 3264 | 19 | driving E-W around bend | July 2001 |
| Road related | 3264 | 20 | looking South from bend | July 2001 |
| Land moving | 2983 | 15 | new driveway | Aug 25, 2001 |
| Road related | 3922 | 8 | North view on Luna Lane (Fall colors) | Oct 2001 |
| Land moving | 3415 | 20-24 | Overflowing creek | Jan 2002 |
| Land moving | 7525 | 16, 17 | Final yard grading | June 2002 |
| Land moving | 7525 | 20 | Grading finished | June 2002 |
| Road related | 1971 | 8-10 | Full moon by road sign | April 2002 |
| Land moving | 3263 | 20 | Building permit posted | June 2001 |
| Masonry | 3263 | 18 | Footings poured | June 2001 |
| Masonry | 3264 | 12-24 | Foundation CMUs | July 2001 |
| Masonry | 2983 | 11-16 | Rock(ing)s and Rollin' | July and Aug 2001 |
| Radiant Piping | 2983 | 17-21 | Laying pipe: a family affair | Aug 30, 2001 |
| Masonry | 2982 | 4-? | Results of slab pour | Sept 8, 2001 |
| Framing | 1616AB | 38-45 | It begins to feel real | Oct 2001 |
| Framing | 1616AB | 20-24 | Roof rafters and more | Oct 2001 |
| Masonry | 1616AB | 14-19 (check numbers) | Biggest screw-ups | Oct 11, 2001 |
| Masonry | 1616AB | 26-37 | Before framing started | Oct 2001 |
| Floor Finishes | 1616AB | 11-18 (check numbers) | Examples of colored concrete at Magnolia Marketplace, North Raleigh | Oct 12, 2001 |
| Framing | 3922 | 1-19A | More progress on framing | Oct 2001 |
| Floor Finishes | 3921 | 2-9 | Tile samples (big disappointment) | Nov 2001 |
| Framing | 3922 (?) | 11 | Whole house view | Nov 2001 |
| Uncategorized | Brother-in-law's digital | camera shot | House before windows | Nov 2001 |
| Roofing | 3922 | 20-24 | Roof color samples | Oct 2001 |
| Roofing | 6918 | unknown | Surprise! Roofers started w/o warning! | Nov 2001 (day before Leonid meteor shower) |
| Roofing | 6918 | 15-20 | Roof views | Nov/Dec 2001 |
| Framing | 6918 | 21 | Dave's treehouse | Dec 2001 |
| Framing | 6918 | 22 | Screened porch | Dec 2001 |
| Framing | 6918 | 29,30 | Siding and windows | Dec 2001 |
| Well Drilling | 3922 | 19-23 | FBO my father-in-law | Nov 7, 2001 |
| Uncategorized | 3415 | 11-13 | Passive solar melts snow | Jan 2002 |
| Framing | 3415 | 14, 16 | Framing crew installs peeled pine porch posts | Jan 2002 |
| Masonry | 3415 | 15 | How post is secured to but not touching slab | Jan 2002 |
| Structured Wiring | 5212 | 21-37, 40-44 | We wired for computer network, phones, TV, and stereo speakers. | Feb and March 2002 |
| Structured Wiring | 5211 | 1-20 | We needed lots of references before drywall covers it all! | March 2002 |
| Uncategorized | 9746 | 1 | Kitchen cabinets | April 2002 |
| Uncategorized | 9746 | 2 | Heart pine flooring in loft | April 2002 |
| Uncategorized | 9746 | 3, 4, 6, 7 | More kitchen installation | April 2002 |
| Uncategorized | not mine | "frig conserv open" | View of our tiny fridge | unknown |
| Uncategorized | 5211 | 37-44 | Drywall | March 2002 |
| Uncategorized | 9746 | 8 | Built-in cabinetry | April 2002 |
| Not stored on computer | 5047 | 1A, 2A, 10A, 12A, 13A | Built-in cabinetry | May 2002 |
| Not stored on computer | 5047 | 3A-7A | Cut radiant pipe location measured before floor overlay to go down | May 2002 |
| Not stored on computer | 5047 | 8A, 9A | Laundry cabinets we installed | May 2002 |
| Floor finishes (not stored) | 5047 | 14A-21A | Concrete stains, samples run for me to see! | May 2002 |
| Floor finishes (not stored) | 5047 | 23A, 24A | Kodiak color combination on Margauxs (Raleigh restaurant) floor | May 2002 |
| Land moving | 7525 | 1 | Cooking out in yard on campstove | May 2002 |
| Floor finishes | 7525 | 2-5, 13-15 | Before and during concrete staining process | June 2002
|