house in Nov 2001 house in May 2002

Organizing our Home Construction Photos

This is a table describing most of the photos I took during the construction of our passive solar home. I told friends, suppliers and subcontractors that I would post photos on my UNC Web site. It was a little more complicated since I don't own a digital camera.

I took the time to put prints in an album, but I want to be able to tell the story without lugging the album around. Unfortunately my shoebox filing system was a mess! The image identification on a CD often does not match the the numbering of negatives. This exercise has required me to take the important start toward creating Web pages I will want to share with others.

Choosing the headings for the table helped me consider many different ways to organize the images. I will create separate pages for different phases of the project. Had I not learned about how to check download time, I might have made pages that would not be read.

Back to my portfolio page.

This chart will help me select photos for the Photos page linked from the main site.

 

Subdirectory within House Construction Photos Negatives Set Number Image number (if sorted to that level of detail) What is it? When did this occur?
Land moving 1971 15 begin clearing

May 29, 2001

Land moving 1971 16 clearing, notice blue tarp over pine porch posts

May 29, 2001

Land moving 1971 17-23 continue clearing May 29, 2001
Land moving 2983 9 adjusting silt fence July 2001
Road related 3264 19 driving E-W around bend July 2001
Road related 3264 20 looking South from bend July 2001
Land moving 2983 15 new driveway Aug 25, 2001
Road related 3922 8 North view on Luna Lane (Fall colors) Oct 2001
Land moving 3415 20-24 Overflowing creek Jan 2002
Land moving 7525 16, 17 Final yard grading June 2002
Land moving 7525 20 Grading finished June 2002
Road related 1971 8-10 Full moon by road sign April 2002
Land moving 3263 20 Building permit posted June 2001
Masonry 3263 18 Footings poured June 2001
Masonry 3264 12-24 Foundation CMUs July 2001
Masonry 2983 11-16 Rock(ing)s and Rollin' July and Aug 2001
Radiant Piping 2983 17-21 Laying pipe: a family affair Aug 30, 2001
Masonry 2982 4-? Results of slab pour Sept 8, 2001
Framing 1616AB 38-45 It begins to feel real Oct 2001
Framing 1616AB 20-24 Roof rafters and more Oct 2001
Masonry 1616AB 14-19 (check numbers) Biggest screw-ups Oct 11, 2001
Masonry 1616AB 26-37 Before framing started Oct 2001
Floor Finishes 1616AB 11-18 (check numbers) Examples of colored concrete at Magnolia Marketplace, North Raleigh Oct 12, 2001
Framing 3922 1-19A More progress on framing Oct 2001
Floor Finishes 3921 2-9 Tile samples (big disappointment) Nov 2001
Framing 3922 (?) 11 Whole house view Nov 2001
Uncategorized Brother-in-law's digital camera shot House before windows Nov 2001
Roofing 3922 20-24 Roof color samples Oct 2001
Roofing 6918 unknown Surprise! Roofers started w/o warning! Nov 2001 (day before Leonid meteor shower)
Roofing 6918 15-20 Roof views Nov/Dec 2001
Framing 6918 21 Dave's treehouse Dec 2001
Framing 6918 22 Screened porch Dec 2001
Framing 6918 29,30 Siding and windows Dec 2001
Well Drilling 3922 19-23 FBO my father-in-law Nov 7, 2001
Uncategorized 3415 11-13 Passive solar melts snow Jan 2002
Framing 3415 14, 16 Framing crew installs peeled pine porch posts Jan 2002
Masonry 3415 15 How post is secured to but not touching slab Jan 2002
Structured Wiring 5212 21-37, 40-44 We wired for computer network, phones, TV, and stereo speakers. Feb and March 2002
Structured Wiring 5211 1-20 We needed lots of references before drywall covers it all! March 2002
Uncategorized 9746 1 Kitchen cabinets April 2002
Uncategorized 9746 2 Heart pine flooring in loft April 2002
Uncategorized 9746 3, 4, 6, 7 More kitchen installation April 2002
Uncategorized not mine "frig conserv open" View of our tiny fridge unknown
Uncategorized 5211 37-44 Drywall March 2002
Uncategorized 9746 8 Built-in cabinetry April 2002
Not stored on computer 5047 1A, 2A, 10A, 12A, 13A Built-in cabinetry May 2002
Not stored on computer 5047 3A-7A Cut radiant pipe location measured before floor overlay to go down May 2002
Not stored on computer 5047 8A, 9A Laundry cabinets we installed May 2002
Floor finishes (not stored) 5047 14A-21A Concrete stains, samples run for me to see! May 2002
Floor finishes (not stored) 5047 23A, 24A Kodiak color combination on Margauxs (Raleigh restaurant) floor May 2002
Land moving 7525 1 Cooking out in yard on campstove May 2002
Floor finishes 7525 2-5, 13-15 Before and during concrete staining process

June 2002

 

treehouse